$100 off fire rebuilds in Pacific Palisades, Malibu and Altadena through the end of 2027. Let us know your project qualifies when you request a quote
SCV Energy Compliance

California Title 24, Part 6 · Energy compliance

Title 24 reports, built faster from your plans.

More than 30 years of energy compliance experience, backed by our own AI-enhanced workflow. Send your drawings and get the most cost-effective path to compliance, in a reviewed, plan-check-ready package, without the usual wait.

Same-day prescriptive compliance. ADUs and JADUs often same day too with CAD-generated PDFs
Upload plans for a quote See how it works

Residential new construction, additions, alterations and ADUs throughout California. Questions? Call 818-282-5045 and talk to a consultant, not a bot.

What you receive

Every project
Signed CF1R compliance report
Ready to attach to your permit set.
Energy model file
Kept on file for plan-check corrections and revisions.
Mandatory measures summary
Or placed directly into your drawing set with the CF1R, if you prefer.
HERS verification list
Which field verifications the project will need.
Plain-language notes
What the design team and builder need to carry into construction.
Built for Architects Designers & drafters Builders & GCs ADU builders HVAC contractors Homeowners
30+ years in the industry

We have seen every compliance obstacle, and overcome every one.

Difficult additions, tight budgets, unusual designs, tough plan checkers. Three decades in the industry means your project is in hands that already know the way through.

Services

Residential Title 24 compliance, start to permit.

Performance and prescriptive compliance under the current California Energy Code, modeled in CEC-approved software.

01

New single-family homes

Performance-method modeling for new construction, including PV and battery requirements.

02

Additions

Additions modeled as their own zone alongside the existing home, using the existing-plus-addition approach when it helps.

03

Alterations & remodels

Envelope, window and system changes on existing homes, prescriptive or performance. Prescriptive compliance same day.

04

ADUs & JADUs

Detached, attached and garage-conversion ADUs and junior ADUs.

05

HVAC & water heater change-outs

Compliance documents for equipment replacements and heat pump conversions, with same-day prescriptive compliance.

06

Plan-check corrections

Fast responses to building department comments and resubmittals.

Plan sheet integration

We put the compliance documents on your drawings.

Skip the cut-and-paste. We can place the Certificates of Compliance and the Residential Mandatory Measures directly onto sheets in your drawing set, so it goes to plan check complete.

Add it to your quote
  • Certificates of Compliance on sheet
    Signed CF1R pages laid out on energy sheets in your set.
  • Residential Mandatory Measures
    The mandatory measures summary placed on a plan sheet.
  • Kept current through plan check
    Sheets updated when the energy report changes.

About residential Title 24

California’s energy code for homes, and why it exists.

Title 24 is California’s Building Standards Code. Part 6 of it, the California Energy Code, sets the minimum energy efficiency every new home, addition and many alterations must meet before a building permit can be issued.

Its purpose

The energy code was born from the 1970s energy crisis, when California set out to cut its dependence on imported fuel. Today it aims to lower utility bills, make homes more comfortable and healthier, reduce greenhouse gas emissions and ease demand on the electric grid.

By law, every requirement must be cost-effective over the life of the building, so the savings a homeowner sees are meant to outweigh what the measures cost to build.

What it covers in a home

Insulation Windows & doors Roofs & attics Heating & cooling Ducts Water heating Ventilation Lighting Solar PV & battery-ready

Two ways to comply

Prescriptive: meet a fixed checklist of requirements, item by item. Performance: model the whole home with state-approved software and trade off measures, so a strength in one area can make up for another. Performance is where most of the cost savings are found. Prescriptive compliance is available same day.

California’s per-capita energy use has stayed nearly flat since the early 1970s, even as the state’s economy grew.

The California Energy Commission credits its efficiency standards in part. Source: CEC

A short history

  1. 1973
    The oil embargo An energy crisis shows how exposed California is to imported fuel.
  2. 1974
    Warren-Alquist Act The Legislature creates the California Energy Commission and directs it to set energy standards for new buildings.
  3. 1978
    First energy standards California’s first building energy efficiency standards take effect, among the first in the nation.
  4. Every 3 yrs
    Regular updates The code is updated on a three-year cycle, tightening requirements as technology improves.
  5. 2019
    Solar on new homes The 2019 code requires solar PV on newly built low-rise homes.
  6. 2022
    Electric-ready homes Heat pumps enter the baseline and new homes are built ready for electric appliances and batteries.
  7. 2026
    Today’s code The 2025 Energy Code takes effect January 1, 2026, strengthening heat pump requirements for space and water heating. It applies to permits through 2028.

Using CHEERS

How the CHEERS registry fits into your project.

CHEERS is one of California’s approved data registries for residential Title 24 documents. Each registered form gets a unique registration number, and the forms for your project are tracked together from design through final inspection.

Visit cheers.org
  1. CF1R Design · before permit
    Certificate of Compliance Prepared and registered by us as the documentation author, then signed by the responsible designer.
  2. CF2R During construction
    Certificate of Installation Registered and signed by the contractor who installs each energy feature.
  3. CF3R After installation
    Certificate of Verification Registered by a HERS rater when the project needs field verification or testing.

What to expect, by your role

Homeowners

Account usually not needed

We register the CF1R. Your contractor registers the installation forms and your HERS rater registers the verification. Keep the registration number from your plans handy, and make sure your contractor knows which items need HERS verification before final inspection.

Owner-builders

Account needed

If you do the installation work yourself, you become the responsible person for the CF2R and will sign it in CHEERS under your own account. We will show you which forms apply to your project.

Architects & designers

Account needed

As the responsible designer, you sign the CF1R. We prepare the report and register it in CHEERS; you then sign it electronically before the permit set is submitted. Any later design change means a revised CF1R.

Builders, GCs & installers

Account needed

You register and sign a CF2R for each energy feature you install, and give the HERS rater access in CHEERS. A rater can help enter the data, but the installing contractor stays the responsible person.

Not sure what your next CHEERS step is? Call 818-282-5045 and we’ll walk you through it.

AI-enhanced, consultant-led

Faster turnaround. Every report checked by a person.

We have built AI into how we work to take the waiting out of Title 24. You get the speed, and a qualified energy consultant still reviews every project and signs every report.

Faster turnaround

Our AI-enhanced process moves projects from plans to finished report in less time than a traditional workflow.

Consultant-verified

A consultant with more than 30 years in the industry reviews every project before it goes out. AI supports the work; a person signs the report.

Quick revisions

When plans change, updates move quickly, so plan-check corrections do not hold up your permit.

Cost-effective compliance

The lowest-cost way to comply, or your choice of options.

Before anything is finalized, we look for the combination of measures that meets code at the lowest construction cost. Take our recommendation, or compare several compliant options and pick the one that fits your budget and design.

Option A

Our recommendation

The single most cost-effective path to compliance, ready to finalize.

Option B

Compare options

Several compliant packages side by side. You choose before we finalize.

Process

Four steps from plan set to permit.

  1. 1

    Send your plans

    Upload the complete plan set, plus mechanical drawings and window and door specs if you have them.

  2. 2

    Analysis & modeling

    Our AI-enhanced process and a consultant review turn your plans into a complete energy model.

  3. 3

    Review & optimize

    We find the lowest-cost way to comply, or lay out several options for you to choose from before we finalize.

  4. 4

    Deliver & register

    Signed CF1R and supporting documents, registered with a HERS provider data registry where required.

Pricing

Flat fees, quoted up front.

Every quote is fixed once we have seen the plans. Each report includes CHEERS registration, our most cost-effective compliance recommendation, and plan-check corrections at no extra charge.

Alteration or change-out

Equipment replacements and smaller remodels.

from $250

HVAC and water heater change-outs, window and envelope alterations.

Same day for prescriptive compliance

Request a quote

Addition or ADU

Additions, detached and attached ADUs, and JADUs.

from $350

Garage conversions included.

ADUs & JADUs often same day

Request a quote

New home

New single-family construction, including PV sizing.

from $375

Up to 2,500 sq ft CFA. Larger homes from $495.

Super fast with CAD-generated PDFs

Request a quote
Fire rebuilds · through 2027

$100 off Pacific Palisades, Malibu and Altadena rebuilds.

Applies to the rebuilt home only, through the end of 2027. A new detached ADU on the same lot is not a rebuild and is priced normally. Please tell us your project qualifies when you request a quote.

Request a rebuild quote

Add-ons

Compare options

+$125

Several compliant packages side by side, so you can choose before we finalize.

Drawing-set integration

+$125

Certificates of Compliance and Residential Mandatory Measures placed into your drawing set.

Rush service

+$100

Moved to the front of the queue for time-sensitive submittals.

Design-change revision

$75

Rerun and reissue after you change the design. Plan-check corrections stay free.

FAQ

Questions we hear often.

What is a Title 24 report?

It shows that a building project meets California’s Energy Code (Title 24, Part 6). Most building departments require it before issuing a permit for new homes, additions and many alterations.

Do you offer a discount for fire rebuilds?

Yes. Fire rebuilds in Pacific Palisades, Malibu and Altadena qualify for $100 off through the end of 2027. The discount applies to the rebuilt home only; a new detached ADU on the same lot does not count as a rebuild. Just let us know your project qualifies when you request a quote.

When I call, will I talk to AI?

No. Every call is answered by an energy consultant who can talk through your project, not an AI or automated phone system.

Does AI write my report?

No. AI is part of how we work faster, but a qualified energy consultant reviews every project, builds the model and signs the report.

Can you put the reports on our plan sheets?

Yes. We can incorporate the Certificates of Compliance and the Residential Mandatory Measures into your drawing set, so the energy sheets are ready for plan check.

What do you need from me?

The complete plan set, every sheet, not just the pages that look energy-related. Details elsewhere in the drawings affect the model, so a partial set can change the quote or slow the job. If available, please also send mechanical drawings and specifications, and the window and door specs or a supplier quote.

Will you help us keep construction costs down?

Yes. On every project we look for the most cost-effective way to meet code. You can take our recommendation or compare several compliant options before anything is finalized.

What if my design does not comply?

We show you options, such as insulation, window or equipment changes, along with which is the most cost-effective, so you can pick the path that fits.

How fast can you turn a project around?

Prescriptive compliance is same day. ADUs and JADUs are often done the same day too, and every project moves fastest when you send CAD-generated PDFs.

Do I need a CHEERS account?

It depends on your role. Most homeowners do not. Designers who sign the CF1R, contractors who sign installation forms, and owner-builders doing their own installation work do. See the Using CHEERS section above, or call us.

Do you handle plan-check comments?

Yes. Corrections tied to the energy report are included in the quoted fee.

Get a quote

Send your plans. Get a fixed quote.

Attach your plans and tell us a little about the project. We reply within [X] business hours.

What to send

The complete plan set, every sheet
Please send the full set, not just the pages that look energy-related. Details on other sheets affect the energy model, and a partial set can change your quote or delay the job. CAD-generated PDFs, exported straight from your drawing software rather than scanned, get the fastest turnaround.
Mechanical drawings and specifications
If available: HVAC and water heating equipment, ducts and ventilation.
Window and door specifications
If available: the specs or a supplier quote for the windows and doors.
818-282-5045

Call and you will speak with an energy consultant, a real person, never AI or an automated system.

ken@scvenergy.com

Upload your plans and specs Upload the complete plan set (every sheet), plus mechanical drawings and window and door specs if you have them. Please start each file name with the project address, for example “123 Main St – Plans.pdf”. CAD-generated PDFs are fastest. Upload your files Opens a secure upload page in a new tab. No account needed.